Both technologies work on dry-insulated cables up to 36 kV. What changes is how they are installed and where each one fits best.

Reels of red cable at a worksite

In an underground medium-voltage network, a joint has to rebuild everything that was cut to connect the cable: the conductor, the insulation, the screens and the outer sheath. If air or moisture is left inside, the electric field concentrates at that point and the fault shows up over time. Today this is done with ready-to-install kits of two kinds: hot (heat-shrink) and cold (pre-expanded or premoulded).

Heat-shrink

The tubes come expanded from the factory and shrink with heat, from a torch or a hot-air gun, until they fit the cable. A single kit covers a wide range of cross-sections, and it is a technique every jointer knows. In exchange, it needs a heat source and even application: a poorly heated tube can trap air.

In the catalogue: the Instelec medium-voltage heat-shrink joint, for cables up to 36 kV, with aluminium or copper connectors.

Cold-applied

The rubber body comes stretched over a support that is removed on site; once it is pulled out, the body shrinks onto the cable by itself. Premoulded bodies are pushed onto the prepared cable. No flame is needed, which helps in manholes, tunnels and places where fire is restricted. Each size covers a narrower range of diameters, so it is chosen with the cable dimensions at hand, and pre-expanded joints have a storage time set by the manufacturer.

In the catalogue: the 3M QS 2000 joint, pre-expanded, and the ABB SOJ joint, premoulded, with models approved by UTE for its distribution network. Both for dry-insulated cables up to 36 kV.

What to check before choosing

  • The cable: voltage, insulation (XLPE or EPR), cross-section, copper or aluminium conductor and screen type (wire or tape).
  • The site: whether a flame can be used and how much room there is in the manhole or trench.
  • Who takes over the work: on the UTE network, materials must be approved.
  • Who installs it and which tools they have.

If you have the cable data sheet and the project details, send us an enquiry and we will help you pick the kit.